Commit Graph

10 Commits

Author SHA1 Message Date
dennisthiessen f523fa986c Shrink avatar, drop availability signal, slim deploy deps
My Gatsby Deployment pipeline / build-and-deploy (push) Successful in 3m42s
Make the portrait smaller (200px) and tighten the hero columns. Remove
the "Open to new work" status and neutralise the contact copy so nothing
reads as job-seeking; show a plain location in the top bar instead.

Deploy/tooling: drop the unneeded `--force` from the install (verified a
clean --legacy-peer-deps install + gatsby build both pass). Replace
gatsby-plugin-offline with gatsby-plugin-remove-serviceworker to retire
the service worker (fixes stale-cache-after-deploy and removes the
workbox deprecation).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-28 17:51:50 +02:00
dennisthiessen 8856e7c273 Redesign site and modernize tooling
My Gatsby Deployment pipeline / build-and-deploy (push) Successful in 4m4s
Replace the HTML5-UP "Strata" theme with a Swiss-minimal single-page
design (plain CSS, Space Grotesk / Hanken Grotesk / Space Mono). Rewrite
copy for current positioning: Staff Data, Analytics & AI Engineer at
Swisscom, open to new work. Experience shown as a pipeline timeline;
contact simplified to email + LinkedIn (drop the broken form).

Prune unused deps (lightbox, FontAwesome, sass/gatsby-plugin-sass) and
the old SCSS, fonts and gallery assets. Fix package.json metadata.

Harden the Gitea deploy: merge build+deploy into one job (removes the
deprecated artifact upload/download handoff), bump Node 18 -> 20, use
npx gatsby build. Rename .nvrmc -> .nvmrc and refresh the README.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-28 16:53:32 +02:00
dennisthiessen 346e392c5b updated
My Gatsby Deployment pipeline / build (push) Successful in 1m40s
2025-03-15 23:24:01 +01:00
dennisthiessen fd5c94254a updated
My Gatsby Deployment pipeline / build (push) Failing after 1m48s
2025-03-15 23:19:52 +01:00
dennisthiessen cb47a5289d update
My Gatsby Deployment pipeline / build (push) Failing after 1m10s
2025-03-15 23:08:02 +01:00
dennisthiessen adb7fd16af updated to v5
My Gatsby Deployment pipeline / build (push) Failing after 1m23s
2025-03-15 23:03:53 +01:00
dennisthiessen d65efae8d8 updated workflow
My Gatsby Deployment pipeline / build (push) Failing after 38s
2025-03-15 22:55:19 +01:00
dennisthiessen 44eee32302 updated packages
My Gatsby Deployment pipeline / build (push) Failing after 5s
2025-03-15 22:46:05 +01:00
Dennis Thiessen babd59dcf7 Updated favicon and header details 2019-05-17 13:01:09 +02:00
Dennis 743246102e Initial commit from gatsby: (https://github.com/ChangoMan/gatsby-starter-strata.git) 2019-05-07 10:49:36 +02:00