Scout triage 2026-10-20
- 109 new rows screened; 23 JDs read in full and logged with the failing
line quoted; 4 Google reqs screened 10-21. One new maybe (Google Senior
SRE, YouTube ML); SBB Team Ampere skipped on the user's Niveau rule (J).
Google Staff Software Engineer, Shopping Graph (Feeds Infra), Zurich
- Chosen as the single Google application after comparing all live Zurich
reqs. Evidence Fit 70, Stretch (Staff-level technical leadership is the
defining responsibility and only Adjacent), hard gate PASS, channel weak.
- Resume generated, critiqued (Document Quality 84), edited for leadership
framing, finalized and submitted 2026-10-21. No cover letter.
- The summary line "sets the technical direction for the data products of
his domains" rests on the user's 2026-10-21 statement and is deliberately
NOT in claims.json (user request); recorded in the session Edit History.
- Registry: new applied entry; the Commerce entry is marked superseded.
KB: software design and architecture
- User-confirmed 2026-10-21: design and architecture of the ingestion and
inference scripts at Bosch (2020-22) and of data products at Swisscom; the
two together exceed three years. Recorded on BS-1, BS-2 and SW-7, with
`designed` added to the BS-1/BS-2 verbs, scoped to his own scripts and the
inference integration (the first patch over-extended it to the data
services and was trimmed the same session).
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>