Two review findings on 22bee28, both reproduced before fixing.
[1] Concurrent writes could lose or rewind a row. record_finish did
select-then-insert-or-update, and pipelines are separate scheduler jobs that can
overlap while sharing step ids -- data_collector belongs to all four. Reproduced
both halves: two sessions that SELECT before either INSERTs make the second
commit raise IntegrityError, which _persist_job_run swallows, so the run
silently vanishes; and a later write carrying an OLDER finished_at rewound the
row from 12:00 back to 09:00, dragging the status with it, so the panel would
report a stale outcome as the latest.
Now a single atomic INSERT ... ON CONFLICT (job_name) DO UPDATE, guarded by
WHERE job_run_state.finished_at < excluded.finished_at so an older completion
can never overwrite a newer one. Dialect-specific because prod is Postgres and
tests are SQLite; both support it (SQLite >= 3.24, ours is 3.45). updated_at is
set explicitly, as the model's onupdate hook does not fire for a core upsert,
and get_map now uses populate_existing since core writes leave any
previously-loaded ORM instance stale in the identity map.
[2] Shutdown could dispose the engine underneath a pending write.
scheduler.shutdown(wait=False) returns before APScheduler dispatches its
completion events, and those events are what create persist tasks -- so a single
snapshot of the task set missed writes still to be queued. flush_job_run_persists
now settles briefly for pending callbacks, then drains in a loop until the set
stays empty, with the deadline still bounding total shutdown time. Left
shutdown(wait=False) alone deliberately: waiting would block a deploy restart
behind a long-running scan.
Six regression tests: interleaved first writes, older-never-rewinds,
newer-still-wins, a task queued mid-drain, prompt return when idle, and giving
up rather than hanging shutdown.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>