Commit Graph

2 Commits

Author SHA1 Message Date
dennisthiessen 9c6a0a72fa Redesign: phosphor-terminal identity and simplified 4-page structure
Deploy / lint (push) Successful in 6s
Deploy / test (push) Successful in 31s
Deploy / deploy (push) Successful in 22s
Information architecture (6 nav destinations -> 4):
- New Overview home: metric strip (live setups, high confidence,
  hit rate, expectancy), top-5 setups, watchlist pulse
- Market = Watchlist + Rankings merged as tabs; scoring weights
  moved into a collapsible disclosure
- Signals = Scanner + Performance merged as tabs (Setups | Track
  Record) with actions inside the panels
- Legacy routes redirect (/watchlist, /rankings, /scanner,
  /performance)

Visual identity:
- Warm ash-green dark palette replaces cold navy; citron lime
  accent replaces blue (Tailwind gray/blue remapped at config
  level so all components reskin)
- Primary buttons: lime with ink text; long/short stays
  emerald/red
- Typography: Bricolage Grotesque display, Instrument Sans body,
  IBM Plex Mono for all numerals incl. chart canvas labels
- Atmosphere: graph-paper grid + citron glow + film grain;
  pulsing brand dot; mono-numbered nav

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-06-12 14:42:05 +02:00
Dennis Thiessen 61ab24490d first commit
Deploy / lint (push) Failing after 7s
Deploy / test (push) Has been skipped
Deploy / deploy (push) Has been skipped
2026-02-20 17:31:01 +01:00