3 Commits
Author SHA1 Message Date
dennisthiessenandClaude Opus 5 f5d4b516ab docs: land capacity-study evidence and share the rank-map helper
Deploy / lint (push) Successful in 10s
Deploy / test (push) Successful in 1m21s
Deploy / deploy (push) Successful in 37s
Brings the durable artifacts of research/portfolio-capacity-rebalancing onto
main so the rationale for raising the count cap lives with the code that cites
it. The matrix runner, the research simulator hooks and the study's unit tests
are deliberately left behind; they remain at tag research/portfolio-capacity-final.

Corrects conclusions that were reached on EV per trade and are now superseded:
the findings doc's decisions 1 (keep cap 10) and 4 (run the risk-floor A/B) are
struck through and answered in a new correction section, and the research README
and phase-A matrix entries are updated to match. The frozen specification itself
is untouched -- its recorded SHA-256 f1e37783 still verifies.

effective-risk-floor-ab.md is retained but marked CLOSED/NEGATIVE: the study it
proposes is already answered by cap15 vs cash_unbounded (-0.753pp CAGR while
EV/trade rises), and its EV-based pass rule would have shipped it.

scripts/research_rankings.py replaces a fourth copy of the historical rank-map
helper; run_research_matrix, run_execution_recovery_matrix and
run_daily_reentry_matrix now share it. The shared version adds a duplicate
observation guard and a deterministic symbol tie-break the copies lacked.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-08-05 23:08:29 +02:00
dennisthiessen 5a61b164f6 docs: lock execution-recovery decisions and ops constraints
Record monotone fill-timing gradient, live [1.57,1.77] bracket, recover-flag
interpretation, gap-cap as third tail-trim, and pre-scheduler ops checklist.
2026-07-18 17:07:22 +02:00
dennisthiessen 3eb6192a1e feat: log Phase A decisions and add execution-recovery matrix
Document Phase A (max-hold/vol/corr closed; next-open as decision baseline).
Add stale_close and next_open gap-cap fill modes plus a small matrix to test
whether near-close scheduling recovers overnight momentum drift.
2026-07-18 16:27:10 +02:00