feat(app): Google Staff SWE, Shopping Graph submitted; design/architecture KB gap closed; scout triage 2026-10-20

Scout triage 2026-10-20
- 109 new rows screened; 23 JDs read in full and logged with the failing
  line quoted; 4 Google reqs screened 10-21. One new maybe (Google Senior
  SRE, YouTube ML); SBB Team Ampere skipped on the user's Niveau rule (J).

Google Staff Software Engineer, Shopping Graph (Feeds Infra), Zurich
- Chosen as the single Google application after comparing all live Zurich
  reqs. Evidence Fit 70, Stretch (Staff-level technical leadership is the
  defining responsibility and only Adjacent), hard gate PASS, channel weak.
- Resume generated, critiqued (Document Quality 84), edited for leadership
  framing, finalized and submitted 2026-10-21. No cover letter.
- The summary line "sets the technical direction for the data products of
  his domains" rests on the user's 2026-10-21 statement and is deliberately
  NOT in claims.json (user request); recorded in the session Edit History.
- Registry: new applied entry; the Commerce entry is marked superseded.

KB: software design and architecture
- User-confirmed 2026-10-21: design and architecture of the ingestion and
  inference scripts at Bosch (2020-22) and of data products at Swisscom; the
  two together exceed three years. Recorded on BS-1, BS-2 and SW-7, with
  `designed` added to the BS-1/BS-2 verbs, scoped to his own scripts and the
  inference integration (the first patch over-extended it to the data
  services and was trimmed the same session).

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
dennisthiessenandClaude Opus 5.5 committed 2026-10-22 09:18:50 +02:00
1 parent dbf937043e
commit 7d8166ddd2
12 files changed
+984 -16

No files matched your search

@@ -0,0 +1,41 @@
# Software design and architecture at Bosch and Swisscom — user clarification
Source: direct user message, 2026-10-21, during the Google *Staff Software Engineer, Shopping Graph*
fit check. The posting's minimum qualification under test was *"3 years of experience with software
design and architecture."*
Question asked: since when he has done software design or architecture work, e.g. how long he designed
services and integrations at Bosch and since when he has designed data products at Swisscom.
Verbatim:
> Yeah, I mean... Software Design and Architecture (for Data Products, for ingestion/inference scripts at Bosch) were part and my work at Swisscom and Bosch can consider this.
Established facts:
- **Bosch (2020-02 to 2022-12):** software design and architecture were part of his work, for the
**ingestion and inference scripts** he built. "Scripts" is his word; the statement does not extend
`designed` to the Bosch data services in general. This pairs with BS-1 (the Zeugnis's
*"Erarbeitung und Durchfuehrung von Integrationsstrategien"* for ML models in the 24/7 fab) and BS-2
(data services in Python/Java/C# over Oracle and Hadoop/Impala).
- **Swisscom (2023-10 to present):** software design and architecture were part of his work, for
**data products** (SW-7; the 2026-10-03 clarification already established design of data products as
current work).
- The user states that his work at both employers can be counted toward a "years of software design and
architecture" requirement. Bosch alone spans 2 years 11 months (elapsed time). Together with the
Swisscom data-product design, the total exceeds three years.
Not established:
- The date design work began at Swisscom. The ART B2B / ART DPT switch date stays deliberately unrecorded,
so never date it.
- Any architecture role or title, any company-wide or cross-organisation architecture authority, and any
architecture-governance or design-authority function. Design is scoped to **his own** ingestion and
inference scripts, the inference integration (BS-1) and his data products.
- The architecture of shared platforms (the Data Mesh, ODP-Flow, the Bosch fab IT architecture). Scope
Discipline still applies: he designed his components inside them, never the platforms themselves.
- Full-time-equivalent years. The year count is elapsed time, consistent with the D3 ruling on Bosch
part-time.
Canonical destination: BS-1, BS-2 and SW-7 scope notes, plus `designed` as an allowed verb on BS-1 and
BS-2 for his own scripts only, in `resume_builder/canonical/claims.json`.