feat(app): Google Staff SWE, Shopping Graph submitted; design/architecture KB gap closed; scout triage 2026-10-20
Scout triage 2026-10-20 - 109 new rows screened; 23 JDs read in full and logged with the failing line quoted; 4 Google reqs screened 10-21. One new maybe (Google Senior SRE, YouTube ML); SBB Team Ampere skipped on the user's Niveau rule (J). Google Staff Software Engineer, Shopping Graph (Feeds Infra), Zurich - Chosen as the single Google application after comparing all live Zurich reqs. Evidence Fit 70, Stretch (Staff-level technical leadership is the defining responsibility and only Adjacent), hard gate PASS, channel weak. - Resume generated, critiqued (Document Quality 84), edited for leadership framing, finalized and submitted 2026-10-21. No cover letter. - The summary line "sets the technical direction for the data products of his domains" rests on the user's 2026-10-21 statement and is deliberately NOT in claims.json (user request); recorded in the session Edit History. - Registry: new applied entry; the Commerce entry is marked superseded. KB: software design and architecture - User-confirmed 2026-10-21: design and architecture of the ingestion and inference scripts at Bosch (2020-22) and of data products at Swisscom; the two together exceed three years. Recorded on BS-1, BS-2 and SW-7, with `designed` added to the BS-1/BS-2 verbs, scoped to his own scripts and the inference integration (the first patch over-extended it to the data services and was trimmed the same session). Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
This commit is contained in:
1 parent
dbf937043e
commit
7d8166ddd2
12 files changed
+984
-16
No files matched your search
@@ -0,0 +1,41 @@
|
||||
# Software design and architecture at Bosch and Swisscom — user clarification
|
||||
|
||||
Source: direct user message, 2026-10-21, during the Google *Staff Software Engineer, Shopping Graph*
|
||||
fit check. The posting's minimum qualification under test was *"3 years of experience with software
|
||||
design and architecture."*
|
||||
|
||||
Question asked: since when he has done software design or architecture work, e.g. how long he designed
|
||||
services and integrations at Bosch and since when he has designed data products at Swisscom.
|
||||
|
||||
Verbatim:
|
||||
|
||||
> Yeah, I mean... Software Design and Architecture (for Data Products, for ingestion/inference scripts at Bosch) were part and my work at Swisscom and Bosch can consider this.
|
||||
|
||||
Established facts:
|
||||
|
||||
- **Bosch (2020-02 to 2022-12):** software design and architecture were part of his work, for the
|
||||
**ingestion and inference scripts** he built. "Scripts" is his word; the statement does not extend
|
||||
`designed` to the Bosch data services in general. This pairs with BS-1 (the Zeugnis's
|
||||
*"Erarbeitung und Durchfuehrung von Integrationsstrategien"* for ML models in the 24/7 fab) and BS-2
|
||||
(data services in Python/Java/C# over Oracle and Hadoop/Impala).
|
||||
- **Swisscom (2023-10 to present):** software design and architecture were part of his work, for
|
||||
**data products** (SW-7; the 2026-10-03 clarification already established design of data products as
|
||||
current work).
|
||||
- The user states that his work at both employers can be counted toward a "years of software design and
|
||||
architecture" requirement. Bosch alone spans 2 years 11 months (elapsed time). Together with the
|
||||
Swisscom data-product design, the total exceeds three years.
|
||||
|
||||
Not established:
|
||||
|
||||
- The date design work began at Swisscom. The ART B2B / ART DPT switch date stays deliberately unrecorded,
|
||||
so never date it.
|
||||
- Any architecture role or title, any company-wide or cross-organisation architecture authority, and any
|
||||
architecture-governance or design-authority function. Design is scoped to **his own** ingestion and
|
||||
inference scripts, the inference integration (BS-1) and his data products.
|
||||
- The architecture of shared platforms (the Data Mesh, ODP-Flow, the Bosch fab IT architecture). Scope
|
||||
Discipline still applies: he designed his components inside them, never the platforms themselves.
|
||||
- Full-time-equivalent years. The year count is elapsed time, consistent with the D3 ruling on Bosch
|
||||
part-time.
|
||||
|
||||
Canonical destination: BS-1, BS-2 and SW-7 scope notes, plus `designed` as an allowed verb on BS-1 and
|
||||
BS-2 for his own scripts only, in `resume_builder/canonical/claims.json`.
|
||||
Reference in new issue
Block a user